Central Taiwan Science Park, south direction external contact road, across Dajia River, and south ramp- Full Casing Piling Work
- Client : Ratio Engineering Co., Ltd.
- Construction method: Full casing piling
- Diameter :∮1.5M、∮2.0M
- Date of Finish : 2017-04