1. Grade: Appraised as class A construction company by the Ministry of the Interior.

2. Paid-in Capital: NT$197 million.

3.Quality:With over 40 years of experience, engineering, and stringent construction quality and scheduling control.

Commendations & Achievements:

1. Appraised as class A construction company by the Taipei City Government.

2. Appraised as a meritorious construction company by the hydraulic engineering Bureau of the Ministry of Economic Affairs.

3. Built deepest pile in Taiwan(Diameter 2M,Pile length 108M)(Zhoumei Bridge)

4. Participates 70% of international commercial port construction in Taiwan (until 2018)

5. Participates first proton therapy system installation work in Taiwan (Linkou Chang Gung Memorial Hospital )

6. First company that introduced extensive crawler crane rental business model in Taiwan

Specialized Fields:

1. Hydraulic engineering projects: Large water works projects including river embankments, irrigation, dams, water gates, and pumping stations.

2. Foundation engineering : bridges, installation work for building ,top-down steel pipe driving microcomputer-controlled vertical calibration method, full casing piling work, RCD, SMW, caisson, diaphragm wall, ground improvement(Sand Compaction, Stone Columns), Pre-boring and Driven PC piles .

Major Construction Equipment:

Our companies ( including affiliated enterprises) own more than 200 sets of heavy construction machinery such as equipment for ground improvement, piling works, complete set of tubular equipment, caisson and cranes.

List of Construction Records:

With a history of over 40 years, our company has contracted numerous hydraulic engineering, civil engineering and bridge construction projects in Taiwan. In recent years, Yuo-Pin, equipped with heavy machinery, has contracted a number of foundation engineering projects as shown in our construction project list.

Service Items:

Pile Engineering(all-casing method, RCD, diaphragm wall, soil mixed wall,low-level side piling); Marine Engineering(steel tube pile, steel sheet pile driving work& tension piling work); Ground Improvement(Sand compaction pile method, Granular pile method); Erection and Installation(bridges& steel structure installation,top-down installation, top-down steel column installation vertical measurement system); Equipment Rental(crawler cranes,generators);top-down steel column dynamic monitoring system; concrete crack detection; ultrasonic tester; clamping structure of clamping pile; followers device; wire-controlled hydraulic vibration drilling system; earth work; frame that connects vibrator