National Highway No.3 the addition of ShuLin Interchange-Retaining Wall Piling Work(Bid B34)

  • Client : Wei Sheng Construction Co., Ltd.
  • Construction method: Full casing piling
  • Diameter : ∮0.8M、∮1.5M
  • Date of Finish : 2016-9